Skip to content
Image of Spelsberg Wallbox Smart Pro
Template

Spelsberg Wallbox Smart Pro

by Gunther Spelsberg GmbH + Co. KGNo rating yet36 downloads

Content languageEnglish

Description

Wallbox - ideal for smart charging of private e-vehicles, charging power up to 11 kW (3-phase)/3.7 kW (1-phase) and a maximum charging current of 16 A, variably adjustable charging current in 1A steps, integrated DC fault current detection for DC residual currents of ≥ 6 mA and temperature monitoring for a safe charging process, stylish design and compact housing dimensions for wall and pedestal mounting, protection class IP54, maximum connection cross-section of supply terminal 6 mm², shock resistance IK08, protection class II.


Simple installation and fast configuration and firmware updates with the free-of-charge Spelsberg Wallbox App (available for iOS, Version 14 and higher, and Android Version 6 and higher).


Integrated MID meter for consumption billing, dynamic load management by phase with unbalanced load detection and meter support for external loads, for efficient use of available power, connection to energy management systems (EMS) for external control for charging with solar energy, free charging or contactless authorisation of the charging process by RFID, Plug & Charge (ISO15118) or AutoCharge, LED and audible signals for clear feedback on status changes, analysis of extensive charging statistics via the Spelsberg Wallbox App or external backends.


Supports communication protocols and interfaces:

  • USB
  • WLAN, Ethernet (2 RJ45 LAN-Ports)
  • Modbus TCP, EEBus, SMA SEMP
  • OCPP-J 1.6 for connection of external backends

Inputs and outputs · 84

NameTypeUnit
OCPP - CP StatusModbus
State - Error Codes 1Modbus
State - Error Codes 2Modbus
State - Error Codes 3Modbus
State - Error Codes 4Modbus
State - Vehicle (Control Pilot) stateModbus
State - Charge Point availabilityModbus
Installation - Safe CurrentModbus
Installation - Hardware current limitModbus
Installation - Operator current limitModbus
System - Firmware version 1 majorModbus
System - Firmware version 2 minorModbus
System - Firmware version 3 patchModbus
System - Build NumberModbus
State - Error Events 1Modbus
State - Error Events 2Modbus
State - Error Events 3Modbus
State - Error Events 4Modbus
Installation - Free chargingModbus
OCPP - Free charging modeModbus
Diagnostic - Energy L1Modbus
Diagnostic - Energy L2Modbus
Diagnostic - Energy L3Modbus
Diagnostic - Power L1Modbus
Diagnostic - Power L2Modbus
Diagnostic - Power L3Modbus
Diagnostic - Current L1Modbus
Diagnostic - Current L2Modbus
Diagnostic - Current L3Modbus
Diagnostic - Total energyModbus
Diagnostic - Total powerModbus
Diagnostic - Voltage L1Modbus
Diagnostic - Voltage L2Modbus
Diagnostic - Voltage L3Modbus
DLM - ModeModbus
DLM - Sub-distribution Limit L1Modbus
DLM - Sub-distribution Limit L2Modbus
DLM - Sub-distribution Limit L3Modbus
DLM - Operator Sub-distribution Limit L1Modbus
DLM - Operator Sub-distribution Limit L2Modbus
DLM - Operator Sub-distribution Limit L3Modbus
DLM - External Meter supportModbus
DLM - Number of Slaves connectedModbus
DLM - Overall Current applied L1Modbus
DLM - Overall Current applied L2Modbus
DLM - Overall Current applied L3Modbus
DLM - Overall Current available L1Modbus
DLM - Overall Current available L2Modbus
DLM - Overall Current available L3Modbus
15118 - Scheduled TimeModbus
15118 - Scheduled DateModbus
State - Maximum charging current offeredModbus
Installation - Charging minimum current limitModbus
15118 - EV required energyModbus
15118 - Charging max. current EVModbus
Report - Session Charged EnergyModbus
Report - Charging session durationModbus
HEMS - RFID tag ID 1Modbus
HEMS - RFID tag ID 2Modbus
HEMS - RFID tag ID 3Modbus
HEMS - RFID tag ID 4Modbus
HEMS - RFID tag ID 5Modbus
15118 - EV battery state percentModbus
15118 - Smart vehicle detectedModbus
15118 - EVCCID 1Modbus
15118 - EVCCID 2Modbus
15118 - EVCCID 3Modbus
15118 - Remaining time to full SoCModbus
15118 - Is in charging loopModbus
State - Session authorization sourceModbus
HEMS - Current LimitModbus
State - Charge Point availabilityModbus
Installation - Safe currentModbus
Installation - Free chargingModbus
Installation - OCPP Free charging modeModbus
DLM - Operator EVSE Sub-distribution Limit L1Modbus
DLM - Operator EVSE Sub-distribution Limit L2Modbus
DLM - Operator EVSE Sub-distribution Limit L3Modbus
HEMS - Current LimitModbus
HEMS - RFID tag ID 1Modbus
HEMS - RFID tag ID 2Modbus
HEMS - RFID tag ID 3Modbus
HEMS - RFID tag ID 4Modbus
HEMS - RFID tag ID 5Modbus

FAQ

No questions have been answered yet.

Ratings and comments

No ratings or comments yet.

Questions and answers

No questions have been asked yet.

Report this entry

Report abuse

You have to be logged in to report an entry. Log in